Feed › California › El Dorado County
Special use permit, 2 acres — El Dorado County
El Dorado County, Planning Commission. Special use. First seen on an agenda Nov 11, 2026.
- On an agendaDec 14, 2023
- Last meetingPlanning Commission, Thu May 23, 2024 3 meetings so far
- DecisionPassed May 23
Track record: El Dorado County approved 84 of 84 special uses decided since 2021 (100%).
From govmeet.us/app/case/4505621, November 25, 2026
The line on the agenda
…consider EDH Verizon Wireless Telecommunications Facility (Conditional Use Permit CUP23-0010) request for a Conditional Use Permit for the construction and ongoing operation of an unmanned, 97-foot-tall faux pine tree (monopine) wireless telecommunications facility and accessory items within a 19’-5” x 19’-0” (179 sq ft) lease area. The telecommunications facility is proposed to include one (1) 97-foot tall monopine tower, nine (9) antennas (with three (3) future antennas proposed), six (6) remote radio units (with three (3) future remote radio units proposed), four (4) surge suppressors, a 50KVA stepdown transformer with 100AMP, 480V transformer disconnect, and three (3) equipment cabinets. No water or sewer service would be required for the proposed project as it is an unmanned facility. The property, identified by Assessor’s Parcel Number 117-084-005, consisting of 2 acres, is located on the west side of Hillsdale Circle, approximately 925 feet to the southwest of Robert J. Mathews Parkway, in the El Dorado Hills area, submitted by Verizon Wireless (Agent: Melissa Vios, Epic Wireless); Staff recommends the Planning Commission take the following actions: 1) Adopt the Negative…
Planning Commission (2850 Fairlane Court, Building C, Hearing Room Placerville, CA OR Live Streamed), January 25, 2024. Agenda, p. 7 · Minutes · Meeting page.
The record
Every value links to the agenda or minutes line it came from: tap “from the agenda” to read it.
- Case numbers
- CUP23-0010
Hearing to consider EDH Verizon Wireless Telecommunications Facility (Conditional Use Permit CUP23-0010) request for a Conditional Use Permit for the construction and ongoing operation of an unmanned, 97-foot-tall faux pine tree (monopine) wireless telecommunications facility and accessory items within
- Acres
- 2read from the agenda line
13 more fields not read from the filing yet
Request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.
Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Every step, from the agendas and minutes
- Dec 14, 2023
Planning Commission: Continued
- Jan 25, 2024
Planning Commission: Continued
- May 23, 2024
Planning Commission: Passed