Feed › California › El Dorado County
Special use permit, 5.05 acres — El Dorado County
El Dorado County, Planning Commission. Special use. First seen on an agenda Nov 11, 2026.
- On an agendaJun 13, 2024
- Last meetingPlanning Commission, Thu Jun 13, 2024
- DecisionPassed Jun 13
Track record: El Dorado County approved 84 of 84 special uses decided since 2021 (100%).
From govmeet.us/app/case/4498384, November 25, 2026
The line on the agenda
…to consider Malcolm Dixon Verizon Communications Facility (Conditional Use Permit CUP23-0011) request for a Conditional Use Permit for the construction and ongoing operation of an unmanned, 108-foot-tall faux pine tree (monopine) wireless telecommunications facility and accessory items within a 40’-0” x 40’-0” lease area. The telecommunications facility is proposed to include one (1) 103-foot tall monopine tower, nine (9) antennas, six (6) remote radio units, two (2) surge suppressors, one (1) 30kW diesel standby generator and 211-gallon fuel tank, and two (2) equipment cabinets. The facility will be camouflaged as a pine tree, including branching, needle socks, and paint. Panel antennas would be installed at a tip height of 98’-0”, with the remaining height needed for a faux “crown” to adequately conceal the antennas and maintain a silhouette mimicking a natural pine tree. No water or sewer service would be required for the proposed project as it is an unmanned facility. Electricity will be provided by Pacific Gas & Electric (PG&E). The project is proposing a 55-foot-long, 12-foot-wide access road within a proposed 20’-0” access/utility easement off of Malcolm Dixon Rd., north of …
Planning Commission (2850 Fairlane Court, Building C, Hearing Room, Placerville, CA OR Live Streamed), June 13, 2024. Agenda, p. 6 · Minutes · Meeting page.
The record
Every value links to the agenda or minutes line it came from: tap “from the agenda” to read it.
- Case numbers
- CUP23-0011
Hearing to consider Malcolm Dixon Verizon Communications Facility (Conditional Use Permit CUP23-0011) request for a Conditional Use Permit for the construction and ongoing operation of an unmanned, 108-foot-tall faux pine tree (monopine) wireless telecommunications facility and accessory items withi
- Acres
- 5.05read from the agenda line
13 more fields not read from the filing yet
Request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.
Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Who is behind it
- Named in the agenda lineComplete Wireless Consulting
Complete Wireless Consulting on other agendas · Alert me when it is named again · State registry · LinkedIn · Web
The agenda line names it; it does not say in what role.
Every step, from the agendas and minutes
- Jun 13, 2024
Planning Commission: Passed