Feed › California › El Dorado County
Special use permit, 45 acres — El Dorado County
El Dorado County, Planning Commission. Special use. First seen on an agenda Nov 11, 2026.
- On an agendaOct 10, 2024
- Last meetingPlanning Commission, Thu Oct 10, 2024
- So farContinued Oct 10
Track record: El Dorado County approved 84 of 84 special uses decided since 2021 (100%).
From govmeet.us/app/case/4495968, November 23, 2026
The line on the agenda
Hearing to consider Bowman Telecommunications Facility (Conditional Use Permit CUP23-0009) request for the construction and ongoing operation of a new 110-foot-tall faux water tower telecommunications facility and accessory items within a 31-foot by 35-foot lease area. The telecommunications facility is proposed to include one (1) 110-foot tall faux water tower, nine (9) AT&T antennas- with six (6) future AT&T antennas, 12 remote radio units (RRU), one (1) Global Positioning System (GPS) unit, one (1) 30-kilowatt (kW) alternate current (AC) Diesel standby generator attached to a 190-gallon capacity belly tank, an equipment shelter, eight (8) 190-Ampere-hour (Ah) batteries, nine (9) power trunks, three (3) fiber trunks, surge suppressors, ice bridge, 16 precast foundation blocks for above ground foundation, and chain link fencing surrounding the lease areas. No water or sewer service would be required for the proposed project as it is an unmanned facility. The property, identified by Assessor’s Parcel Number 121-040-026, consisting of 45 acres, is located East side of El Dorado Hills Boulevard, approximately 1,000 feet southeast of the intersection with Olson Lane, in the El Dorado …
Planning Commission (2850 Fairlane Court, Building C, Hearing Room, Placerville, CA OR Live Streamed), October 10, 2024. Agenda, p. 5 · Minutes · Meeting page.
The record
Every value links to the agenda or minutes line it came from: tap “from the agenda” to read it.
- Case numbers
- CUP23-0009
Hearing to consider Bowman Telecommunications Facility (Conditional Use Permit CUP23-0009) request for the construction and ongoing operation of a new 110-foot-tall faux water tower telecommunications facility and accessory items within a 31-foot by 35-foot lease area.
- Acres
- 45read from the agenda line
13 more fields not read from the filing yet
Request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.
Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Every step, from the agendas and minutes
- Oct 10, 2024
Planning Commission: Continued