Feed › California › Humboldt County
Special use permit, 12 acres — Humboldt County
Humboldt County, Planning Commission. Special use. First seen on an agenda Nov 11, 2026.
- On an agendaJan 19, 2023
- Last meetingPlanning Commission, Thu Jan 19, 2023
- DecisionPassed Jan 19
Track record: Humboldt County approved 291 of 317 special uses decided since 2021 (92%).
From govmeet.us/app/case/4260598, November 28, 2026
The line on the agenda
Renewable America, LLC Conditional Use Permit Assessor Parcel Number: 505-151-012, 506-231-019 and 506-231-022 (one separate legal parcel) Record Number: PLN-2022-17922 Arcata area A Conditional Use Permit for the proposed construction and operation of a two phased community-scale solar energy and storage project referred to as: Foster Clean Power A (Phase 1) & Foster Clean Power B (Phase 2). Phase 1 would involve the construction of a 3-megawatt alternating current (MWac), photovoltaic (PV) solar energy facility with associated inverters, fencing, and access road. The access for Phase 1 would be approximately 15 feet wide and have a total length of approximately 164 feet, approximately 73 feet of which would be a new road that connects Foster Avenue to an existing agricultural road located on the south and east perimeters of the project site. The equipment pad would be approximately 50 feet by 100 feet in size. Phase 1 would also include a 1.25-MW battery energy storage system. The project footprint (fence line boundary) for Phase 1 would be approximately 12 acres in size. Phase 2 would involve the construction of an additional 4-MWac PV solar energy facility immediately north of …
Planning Commission (Regular Meeting - Hybrid), January 19, 2023. Agenda, p. 9 · Meeting page.
The record
What the filing states, field by field.
- Case numbers
- 23-63
- Acres
- 12read from the agenda line
13 more fields not read from the filing yet
Request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.
Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Who is behind it
- Named in the agenda lineRenewable America
Renewable America on other agendas · Alert me when it is named again · State registry · LinkedIn · Web
The agenda line names it; it does not say in what role.
Every step, from the agendas and minutes
- Jan 19, 2023
Planning Commission: Passed