Feed › Michigan › Charter Township of Augusta
Met Jul 8, result not posted yet
Site plan, 645 acres — Augusta
Charter Township of Augusta, Planning Commission. Site plan. First seen on an agenda Nov 11, 2026.
- On an agendaJul 8, 2024
- Last meetingPlanning Commission, Mon Jul 8, 2024
- DecisionNot posted yet Minutes often come weeks after the meeting
From govmeet.us/app/case/4223217, November 27, 2026
The line on the agenda
Railsplitter #1 Solar Final Site Plan July 8, 2024 2 east. Of the total 645 acres, the project infrastructure area within the fence (which includes solar arrays and internal project access drives), consists of approximately 193 acres (Figure 1). Figure 1. Aerial Photograph The proposed Railsplitter #1 large solar energy system is a 39.33-magawatt photovoltaic solar energy generating facility consisting of 83,192 solar panels organized in eleven (11) photovoltaic (PV) areas. The solar panels are demonstrated to rotate independently toward the sun. The maximum height (at perpendicular setting) i…
Planning Commission, July 8, 2024. Agenda, p. 2 · Meeting page.
The record
What the filing states, field by field.
- Acres
- 645read from the agenda line
14 more fields not read from the filing yet
Case numbers, request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.
Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Every step, from the agendas and minutes
- Jul 8, 2024
Planning Commission