GovMeet
Sign in

Feed › California › Imperial County

Met Sep 24, result not posted yet

Special use permit, 410 acres — Imperial County

Imperial County, Planning Commission. Special use, Variance. First seen on an agenda Nov 11, 2026.

  1. On an agendaSep 24, 2025
  2. Last meetingPlanning Commission, Wed Sep 24, 2025
  3. DecisionNot posted yet Minutes often come weeks after the meeting

Track this case

From govmeet.us/app/case/4003665, November 22, 2026

The line on the agenda

1. Recommend to the Board of Supervisors approve Variance #24-0002, for the Big Rock 2 Cluster Solar and Battery Storage project. 7h. Consideration of Conditional Use Permit # 24-0007, Big Rock 2 Cluster South totaling 410 acres, which consists of the construction and operation of a utility-scale up to 120-megawatt (MW) in capacity photovoltaic (PV) solar energy generation and Battery Energy Storage System (BESS) facility (up to 240-MW in capacity). CUP#24-0007 is one of four CUPs being considered for simultaneous approval that would not exceed up to 500-MW for the PV portion, nor exceed 500-M…

Planning Commission, September 24, 2025. Agenda, p. 7 · Meeting page.

The record

What the filing states, field by field.

Acres
410read from the agenda line
14 more fields not read from the filing yet

Case numbers, request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.

Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices

Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.

Every step, from the agendas and minutes

  1. Sep 24, 2025

    Planning Commission

    Agenda page, p. 7

Earlier cases like this in Imperial County

294+ earlier cases of the same kind on its agendas since 2022.

Every meeting of Imperial County, by year