Feed › California › El Dorado County
Industrial land, 4.48 acres — El Dorado County
El Dorado County, Planning Commission. Industrial land. First seen on an agenda Nov 11, 2026.
- On an agendaApr 23
- Last meetingPlanning Commission, Thu Apr 23
- DecisionPassed Apr 23
Track record: El Dorado County approved 245 of 247 land cases decided since 2021 (99%).
From govmeet.us/app/case/3862453, November 22, 2026
The line on the agenda
Hearing to consider an APPEAL received from Bill Wilde appealing the approval of Design Review Permit DR24-0010/Business Drive Open Storage Lot submitted by Jim Dillingham, D&Z Structural Engineering to allow temporary construction-material storage. The property, identified by Assessor’s Parcel Number 109-480-027, consisting of 4.48 acres, is located adjacent to Shingle Lime Mine Road at the western edge of the Barnett Business Park, in the Shingle Springs Community Region, approximately 0.5 miles south of the intersection of Durock Road and Shingle Lime Mine Road. Staff recommends the Planning Commission (PC) consider the attached exhibits and receive appellant and applicant comments to determine the appropriate amount of landscaping to require and then instruct staff to revise the original Findings and/or Conditions of Approval and approve DR24-0006. (Supervisorial District 4)
Planning Commission (Planning Commission Hearing Room 2850 Fairlane Court, Building C Hearing Room, Placerville, CA 95667), April 23, 2026. Agenda, p. 5 · Minutes · Recording · Meeting page.
The record
What the filing states, field by field.
- Case numbers
- 26-0626
- Acres
- 4.48read from the agenda line
13 more fields not read from the filing yet
Request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.
Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Every step, from the agendas and minutes
- Apr 23
Planning Commission: Passed