Feed › New Jersey › City of Hoboken
Storage facility; Preliminary and Final Major Site Plan with Bulk
City of Hoboken, Planning Board. Site plan, Variance. First seen on an agenda Nov 11, 2026.
- On an agendaSep 28
- Next meetingPlanning Board, Tue Dec 1, 7:00 PM in 9 days Agenda page, p. 22 meetings so far
- DecisionNot yet Read from the minutes after the vote
From govmeet.us/app/case/3578035, November 22, 2026
The line on the agenda
Block: 145 Lots 5-9 Zone: I-1 Applicant: Montar Group LLC Summary: Storage facility located in Hoboken, NJ. Preliminary and Final Major Site Plan with Bulk. (Also includes land at St. Lawrence Place and Hackensack Plank Road, Block 6, Lots 1 and 3, Weehawken, NJ) Variances: • Minimum Lot Width (200 FT required, 59 FT proposed in Hoboken and 150 FT proposed in Weehawken) • Minimum Front Yard Setback (10 FT required, 5 FT proposed) • Minimum Side Yard Setback (10 FT each side required, 5 FT proposed in Hoboken) • Minimum number of spaces required (230 Spaces Required, 7 proposed) Attorney: Matth…
Planning Board, December 1, 2026. Agenda, p. 2 · Meeting page.
How to take part
The agenda says nothing about comments on its first pages. Most boards take comments at a public hearing: call the clerk to ask how. Agenda, first page.
Draft a public comment
The AI writes a short letter to the board from this case's facts; you edit it and send it. Sign in to draft one (free).
The record
Every value links to the agenda or minutes line it came from: tap “from the agenda” to read it.
- Request
- Storage facility; Preliminary and Final Major Site Plan with Bulk
Storage facility located in Hoboken, NJ. Preliminary and Final Major Site Plan with Bulk
- Zoning
- I-1 → ?
Zone: I-1
- Applicant
- Montar Group LLC
Applicant: Montar Group LLC
- Parcel
- Block 145 Lots 5-9 Search the property record ↗
Block: 145 Lots 5-9
11 more fields not labeled in the filing
Case numbers, acres, units, square feet, conditions, votes, owner, developer, engineer, attorney, where, amount. A name that stands in the text without a role, such as applicant or owner, is not counted.
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Who is behind it
- ApplicantMontar Group LLC
Montar Group on other agendas · Alert me when it is named again · State registry · LinkedIn · Web
Named as the filing names them.
What changed
- Nov 12Hearing moved Mon Sep 28, 6:30 PM → Tue Dec 1, 7:00 PM.
Follow the case or save it to a list and we tell you when it changes.
Every step, from the agendas and minutes
- Sep 28
Planning Board
- Dec 1
Planning Board, coming up