Feed › New Mexico › Dona Ana County
Met Mar 25, result not posted yet
Plat, 6.08 acres — Dona Ana County
Dona Ana County, Board of County Commissioners. Plat. First seen on an agenda Nov 11, 2026.
- On an agendaMar 25, 2025
- Last meetingBoard of County Commissioners, Tue Mar 25, 2025
- DecisionNot posted yet Minutes often come weeks after the meeting
From govmeet.us/app/case/3405327, November 23, 2026
The line on the agenda
Final Plat approval for a Type II Subdivision to be known as Las Flores Subdivision Phase II. - The applicant, Pillar Engineering, is requesting Final Plat approval for the Las Flores Subdivision Phase II, a Type II Subdivision consisting of 32 residential lots on a 6.08-acre parcel, ranging in size from 0.138-acres to 0.175 acres. All utilities will be underground including electricity. Water will be provided by Lower Rio Grande Public Works Authority and wastewater services will be provided by Doña Ana County. Access to the subdivision will be from Otero Street, Vargas Street and Ristra Street. These streets are paved and County maintained. The roads within the subdivision will consist of 34’ from face of curb to face of curb with asphalt pavement over compacted base course and sub-grade preparation, concrete curb and gutter and a 4’ sidewalk on each side of the roadway. Total dedicated ROW will have a width of 52’. There are no recreational facilities proposed for the subdivision.
BOCC Regular Meeting, March 25, 2025, March 25, 2025. Agenda, p. 3 · Meeting page.
The record
What the filing states, field by field.
- Acres
- 6.08read from the agenda line
14 more fields not read from the filing yet
Case numbers, request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.
Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Every step, from the agendas and minutes
- Mar 25, 2025
Board of County Commissioners