Site plan, 30.19 acres — Marion County

Marion County, Development Review Committee. Site plan. First seen on an agenda Nov 11, 2026.

  1. On an agendaSep 11, 2023
  2. Last meetingDevelopment Review Committee, Mon Sep 11, 2023
  3. DecisionNot posted yet Minutes often come weeks after the meeting

Track record: Marion County approved 20 of 24 site plans decided since 2023 (83%).

Track this case

From govmeet.us/app/case/3354259, November 24, 2026

The line on the agenda

…OF FL INC - REVISION TO 29433 - Waiver Request to Major Site Plan Revision in Review 15681 N US HWY 301 Citra Project #2020110044 #30433 Parcel #07619-001-04 Hamilton Engineering & Surveying LDC 6.13.2.C - Geotechnical Criteria CODE states Geotechnical investigation report shall minimally include: (1) A summary of all subsurface exploration data and subsurface soil profiles. (2) Exploration logs, laboratory or in situ test results, groundwater information, the interpretation and analysis of the subsurface data. (3) Recommendations for design, discussion of conditions for solution of anticipated problems, and recommended geotechnical special provisions. APPLICANT requests waiver as we have a Geotechnical report for the area of work, however the borings provided do not fall directly in the location of the pond. The borings measured are all within the area of work and are relatively similar. Additionally, we are not taking into consideration percolation for the sizing of the pond. Due to this, additional borings would not provide any useful information that would improve or change the design we are proposing. LDC 6.13.2.B(4) - Hydrologic Analysis CODE states Hydrologic stormwater…

Development Review Committee, September 11, 2023. Agenda, p. 14 · Meeting page.

The record

What the filing states, field by field.

Case numbers
2023-12586
Acres
30.19read from the agenda line
13 more fields not read from the filing yet

Request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.

Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices

Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.

Every step, from the agendas and minutes

  1. Sep 11, 2023

    Development Review Committee

    Agenda page, p. 14

Similar cases nearby

Site plan in the other governments of Marion County.

Decided since 2022: 1 approved

From the results those governments post. A case counts once, by its last posted decision.