Feed › Florida › Marion County
Site plan, 9.7 acres — Marion County
Marion County, Development Review Committee. Site plan. First seen on an agenda Nov 10, 2026.
- On an agendaMar 2
- Last meetingDevelopment Review Committee, Mon Mar 2
- DecisionNot posted yet Minutes often come weeks after the meeting
Track record: Marion County approved 20 of 24 site plans decided since 2023 (83%).
From govmeet.us/app/case/1440780, November 22, 2026
The line on the agenda
JR Plastics (2008 Expansion) - Waiver to Major Site Plan Parcel #: 31239-005-02 #000299 Mastroserio Engineering LDC 2.21.1 Major Site Plan CODE states A. A Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: (1) Collectively, all existing and proposed impervious ground coverage equals or exceeds 35 percent of the gross site area or 9,000 square feet. (2) The combined driveway trip generation meets or exceeds 50 peak hour vehicle trips. (3) A ROTARY SPORTSPLEX (REVISION TO AR# 30224)24-inch diameter pipe, its equivalent, or larger is utilized to discharge stormwater runoff from the project area. APPLICANT - a waiver is requested to not submit or provide a Major Site Plan for this project. A building plan has been submitted and is under review by the Building Department. A site plan was submitted with the building application, the proposed 10,200 sf building is being placed over existing impervious area. It will be an open air steel building to be utilized for storage of existing materials produced onsite. There will…
Development Review Committee, March 2, 2026. Agenda, p. 5 · Meeting page.
The record
What the filing states, field by field.
- Case numbers
- 2026-22231
- Acres
- 9.7read from the agenda line
13 more fields not read from the filing yet
Request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.
Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Every step, from the agendas and minutes
- Mar 2
Development Review Committee