Feed › Florida › Marion County
Site plan, 14 acres — Marion County
Marion County, Development Review Committee. Site plan. First seen on an agenda Nov 10, 2026.
- On an agendaDec 8, 2025
- Last meetingDevelopment Review Committee, Mon Dec 8, 2025
- DecisionNot posted yet Minutes often come weeks after the meeting
Track record: Marion County approved 20 of 24 site plans decided since 2023 (83%).
From govmeet.us/app/case/1437674, November 22, 2026
The line on the agenda
West Maintenance Building - Major Site Plan 33229 - Waiver to Major Site Plan in Review Project #2003090023 #33229 Parcel # 8001-0000-19 Tillman and Associates Engineering, LLC LDC 6.7.8. Protected tree replacement requirements CODE states - All trees not permitted for removal must be protected and maintained. For those protected trees permitted for removal, trees shall be replaced in accordance with the minimum standards set forth below. A. Replacement is not required where the property owner retains existing trees on the site which total an average of 100 inches DBH per acre. If replacement is necessary, a minimum of 100 inches DBH per acre on the average shall be achieved. B. If the pre-development number of inches is less than 100 DBH per acre on the average, the property owner shall replace trees to equal the pre-development number of DBH inches. C. Replacement of trees less than 30 inches DBH and permitted for removal shall be as described below:(1) Existing trees measuring 10 inches DBH to 19 inches DBH shall be replaced with a ratio of one-inch replacement per two inches removed and the minimum replacement tree size is 3.5-inch caliper. (2) Existing trees measuring 20…
Development Review Committee, December 8, 2025. Agenda, p. 4 · Meeting page.
The record
What the filing states, field by field.
- Case numbers
- 2025-21492
- Acres
- 14read from the agenda line
13 more fields not read from the filing yet
Request, zoning, units, square feet, conditions, votes, applicant, owner, developer, engineer, attorney, parcel, where, amount. These fill in when the filing is read.
Filings on agendas ahead are read as they are posted. An older one is read on request on a paid plan. Prices
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Who is behind it
- Named in the agenda lineTillman and Associates Engineering
Tillman and Associates Engineering on other agendas · Alert me when it is named again · State registry · LinkedIn · Web
The agenda line names it; it does not say in what role.
Every step, from the agendas and minutes
- Dec 8, 2025
Development Review Committee
Similar cases nearby
Site plan in the other governments of Marion County.
Decided since 2022: 1 approved
- May 2022Approve the College Park Townhomes Major Site plan for approximately 1.72 acres located in the College…Approved
City of Ocala
From the results those governments post. A case counts once, by its last posted decision.