Feed › Massachusetts › City of Melrose
Variance — Melrose
City of Melrose, Board of Appeals (ZBA). Variance. First seen on an agenda Nov 16, 2026.
- On an agendaNov 16
- Last meetingBoard of Appeals (ZBA), Wed Nov 18
- DecisionNot posted yet Minutes often come weeks after the meeting
From govmeet.us/app/case/10127523, November 23, 2026
The line on the agenda
…comment portion of the meeting. Cases Public Hearings: 26 018 – 35 Linwood Ave (Request to continue to 11.18.26) – The appeal of David M. Griffin for Variances from §235-6.2 of the Zoning Ordinance for minimum lot area and lot frontage, and §235-11.5.C.2 for two driveways within less than 30 feet of each other, all to construct an addition onto the existing single-family dwelling to conv
Board of Appeals (ZBA), November 18, 2026. Agenda, p. 1 · Meeting page.
Where it is
35 Linwood Ave: the address read from the filing, placed by the US Census geocoder. Larger map
Satellite view ↗Property record and parcel ↗
The record
Every value links to the agenda or minutes line it came from: tap “from the agenda” to read it.
- Case numbers
- 26 018; 26 024; 26 020-R
26 018 – 35 Linwood Ave
- Request
- construct addition to convert single-family dwelling to two-family dwelling; construct full shed dormer onto right side of two-family dwelling
to construct an addition onto the existing single-family dwelling to convert the structure to a two-family dwelling
- Acres
- 7,963 sf lot; 8,499 sf lot
on a lot consisting of 7,963 sf
- Conditions
- request to continue to 11.18.26
Request to continue to 11.18.26
- Parcel
- Assessor's Map D5 0 96; Assessor's Map A5 0 10 Search the property record ↗
shown on Assessor’s Map D5 0 96
- Where
- 35 Linwood Ave; 310 Washington Street
at 35 Linwood Ave in Melrose on a lot consisting of 7,963 sf
9 more fields not labeled in the filing
Zoning, units, square feet, votes, applicant, owner, developer, engineer, attorney, amount. A name that stands in the text without a role, such as applicant or owner, is not counted.
Every case is read for the same fields, so two cases always line up. Wrong or missing? Use “Report a mistake”; we check reports within 48 hours.
Every step, from the agendas and minutes
- Nov 18
Board of Appeals (ZBA)